Case Studies

Up to Date Developments

Explore our Case Studies to see how REIC Specialty delivers innovative, reliable rental solutions across Oil & Gas, Construction, Industrial, and Event sectors. From complex climate control challenges to specialized power and ventilation solutions, our real-world success stories showcase our expertise, efficiency, and commitment to customer success. See how we’ve helped businesses overcome challenges, improve operations, and achieve their goals.

Categories

With a floor plan spanning over 3 million square feet, performing interior construction during winter in the Midwest can prove challenging. The general contractors on this project had previously been using a standard heater line that they typically use on other projects, with limited success. Given the massive scale of this building, traditional heaters were not delivering the temperatures desired, nor were they pushing heat to the interior of the building.
While building a new manufacturing plant in Texas, a large international technology company grew tired of the labor required for its existing solar light towers. The firm also wanted to monitor the job site more closely, which was not possible until REIC entered the job.
Constructing a dam with more than two million cubic meters of concrete requires a massive effort of manpower and equipment. Year after year as the project continued, Cahill became more essential to the success of this project than ever imagined.
When building a multi-story building with 100,000 square foot floors, a powerful heater is needed to deliver heat across such a large space. The general contractor for this project relied on a past rental heater they had used on other projects, but it did not get the results they needed. Following weeks of heat not reaching the upper floors from low static pressure, the GC was concerned when temperature requirements were not met and the project schedule was threatened due to interior finish work falling behind.
Missouri – Despite having an advanced HVAC system, a large manufacturing plant faced significant challenges in controlling indoor humidity levels. High humidity was causing product clumping, machinery jams, and frequent production line shutdowns, resulting in substantial financial losses. Nearly 70% of their product was rendered unusable due to humidity-related issues, so the facility knew a solution was critical. After initial discussions, REIC Specialty was brought in to evaluate the situation and recommend an action plan.
Wisconsin – An industrial painting company undertaking the first phase of an interior tank painting project enlisted REIC Specialty to manage climate control. With a diameter exceeding 200 feet and a floating ceiling, the tank required surface blasting and steel preparation ahead of the industrial paint application in phase two.