Case Studies

Up to Date Developments

Explore our Case Studies to see how REIC Specialty delivers innovative, reliable rental solutions across Oil & Gas, Construction, Industrial, and Event sectors. From complex climate control challenges to specialized power and ventilation solutions, our real-world success stories showcase our expertise, efficiency, and commitment to customer success. See how we’ve helped businesses overcome challenges, improve operations, and achieve their goals.

Categories

Wisconsin – An industrial painting company undertaking the first phase of an interior tank painting project enlisted REIC Specialty to manage climate control. With a diameter exceeding 200 feet and a floating ceiling, the tank required surface blasting and steel preparation ahead of the industrial paint application in phase two.
An event space recently contacted TCR to help provide cool and comfortable conditions for their summer events in a facility without a permanent HVAC system. This large, antiquated building offered electric connections and high roofs but lacked any cooling on the premises. With years of experience working on similar projects, the TCR team knew how to deliver the necessary conditions.
Massachusetts – As the final stages of construction approached for a new administration and student services building at a Northeastern college, climate control emerged as a necessity.
A private college in central Connecticut faced a cooling challenge in its recreational facility. During the warm months, when many students were away for the summer, several events forced the school to address this cooling issue.
A private college in central Connecticut faced a cooling challenge in its recreational facility. During the warm months, when many students were away for the summer, several events forced the school to address this cooling issue.
Outside Denver, CO, a local event organizer was tasked with hosting a significant gathering within several temporary tent structures. Recognizing the importance of comfort, especially during the warm summer months, they acknowledged the need for an effective cooling solution to ensure attendees’ comfort and maintain an atmosphere on par with a premium event experience.
During the renovation of a downtown building in the heart of Minneapolis, the general contractor faced the rise of summer weather—with the approaching increase in temperature and humidity. With critical finishing stages looming and no operational HVAC system, the integrity of the building’s woodwork and flooring installation was at risk. It was then that Construction Heaters, Inc. (C.H.I.) was called to deliver a custom climate control solution.
A prominent financial institution in Virginia was at risk of closure due to a sudden HVAC failure during a heatwave. The high indoor temperatures compromised the comfort and safety of customers and staff, making immediate cooling solutions imperative.
Amidst a sweltering New Jersey summer, a popular beauty salon encountered a critical issue when their HVAC system failed. With hair dryers and other heat-generating equipment in use, maintaining a cool environment was essential for comfort and ensuring operational continuity.
In the heart of Maryland, a medical treatment center faced a dire situation when its permanent air conditioning system unexpectedly failed. The stakes were high: without adequate cooling, the facility risked temporary closure, jeopardizing access to essential medical treatments for patients